Garage floor epoxy, flake coatings and polyaspartic topcoats built for a city that holds Arizona’s all-time heat record. We come to your home in Havasu, grind the slab, and coat it the right way so it doesn’t peel the first July.
(928) 490-8929 Call Now for a Free Estimate
Epoxy flooring is a resin coating bonded to bare concrete. In a Lake Havasu City garage that usually means three layers: a base coat, a broadcast of colored vinyl flakes, and a clear topcoat that seals it all in. The result is a floor that wipes clean, doesn’t soak up oil, and hides the dust that blows in every time the door goes up.
Most of our calls come from homeowners with a two- or three-car garage, an RV or boat bay, or a golf cart that lives inside. Shops and service bays along Highway 95 call too. The question we hear most is “Why did my last coating peel?” Usually, nobody ground the concrete first.
See every system we install on the epoxy flooring services page.
Summer jobs start at first light, while the slab is still cool. Hot concrete makes the material set fast, and rushing it is how you end up with roller marks.
Garage Floor EpoxyFlake epoxy systems for one, two and three-car garages, plus RV and boat bays.
Polyaspartic CoatingA UV-stable topcoat that holds up to Havasu sun at the door line and cures in a day.
Metallic EpoxyPoured, swirled metallic floors for game rooms, home gyms and showrooms.
Commercial EpoxySlip-resistant coatings for shops, boat service bays, kitchens and warehouses.
We grind every floor. No acid etch, no shortcuts. Grinding is noisy and dusty, so we run it with a vacuum attached and keep the dust out of your house.
We build for heat, not for a catalog. On June 29, 1994, Lake Havasu City hit 128°F, still the hottest temperature ever recorded in Arizona. Floors here get topcoats that don’t amber in the sun at the door line.
We tell you when not to coat. If a slab has a moisture problem, coating it anyway just buys you a peeling floor. We’d rather lose the job than install one.
Tip: whoever you hire, ask for their Arizona ROC license number and look it up on the Registrar of Contractors site before you sign anything.
The price of a garage floor coating comes down to a handful of things we can see in a 20-minute visit:
Most people are surprised that grinding, not the coating, is the biggest labor line. It’s also the line cheap bids leave out. Call (928) 490-8929 and we’ll give you an exact written price after we see the floor.
A good fit: you park inside, store a boat, side-by-side or golf cart, work on cars, or just want a garage you can hose out. Homeowners planning to stay a few years get the most out of it.
Maybe not yet: the slab was poured in the last 28 days, there’s water coming up through the concrete, or the house is about to be torn up for a remodel. Coat after that work is done.
A properly ground and coated garage floor usually lasts 10 to 20 years before it needs a fresh topcoat. The part that wears first in Lake Havasu City is the strip by the door that sits in direct sun. We finish most garages with a UV-stable polyaspartic topcoat instead of plain epoxy for that reason. DIY roll-on kits on unground concrete often start peeling in the first year.
Hot tire pickup happens when a tire softens a thin or poorly bonded coating and lifts it off the slab. After a summer drive on SR-95 your tires can be hot enough to do it to a hardware-store kit. Diamond grinding the concrete first and using a full-thickness base coat is what stops it.
Yes, but the schedule changes. Epoxy and polyaspartic cure faster as the slab gets hotter, so in June through September we start at first light and work while the concrete is still cool. October through April is the easiest season to coat a garage floor here, and it books up first.
Plain epoxy is strong and bonds well, but it yellows (ambers) in sunlight. Polyaspartic is UV-stable, cures in hours and handles temperature swings better. Most garage systems we install use an epoxy or polyaspartic base, a flake broadcast and a polyaspartic clear topcoat, so you get both.
You can usually walk on a one-day polyaspartic floor that evening and park on it in about 24 to 48 hours. A full epoxy system takes longer, often three to five days before heavy vehicles. Boats on trailers and RVs should wait the full cure time for the system we used.
Yes. Cracks get ground out and filled before coating, and old paint or a failed DIY coating has to be ground off completely, because a new coating is only as good as what it sticks to. A slab with an active moisture problem is the one case where we may tell you to hold off and fix the water first.
Free on-site estimates across Lake Havasu City, Desert Hills and Parker. Call and we’ll set a time.
Call (928) 490-8929 for a Free Estimate2159 McCulloch Blvd N Suite 2, Lake Havasu City, AZ 86403
Please note: This is our service business address, not a storefront or showroom. Lake Havasu Epoxy Flooring is a mobile epoxy flooring service, so we come to you and the office isn’t open to walk-in visitors. Call us and we’ll set up a free on-site estimate.